UK
NL
 Leveranciers-login
Home
STAY INFORMED
Subscribe to our monthly newsletter.
Your email address will never be disclosed to any third party.
Read our privacy notice.

       

Product news
22-07-2020  |  272x
Share this item

Kemp increases production yield at dry mortar factory

Realization 2-compartment silo for production increase

At Remix Droge Mortel BV - Hardenberg, a 12 meter high 2 compartment silo was placed last week. In order to increase the existing production yield, Kemp bv was commissioned to adjust the production process, by placing a silo directly above the bagging machine.

In close collaboration with partner companies, a self-supported steel construction was realized, over the existing roof, on which the silo was placed. In combination with a 3 meter long stainless steel vibrating conveyor equipped with a VibraDrive® (Alvibra) and a bucket elevator (including cleaning bottom), the product is transported into the silo. In addition, the silo is also equipped with blow-in pipes.

A sound-insulated instrumentation compartment has been realized on the top of the silo, which minimizes noise emission to the surroundings. Furthermore, 1 compartment is equipped with a anti-segregation construction which has previously proved its effectivity.

Company information

Related content

PROCES MEDIA
Solids Processing Fluids Processing MB Maintenance SchuettgutPortal
SIGN UP FOR OUR NEWSLETTER
Newsletter archive
Follow us
Linked
MAGAZINE
Subscriptions
Service and contact
ContactDisclaimerPrivacyAdvertising