Fluids Processing Maintenance in Processing  
    Info     Contact     Newsletter     Statistics     Disclaimer     Privacy     Company log-in     Advertise 
    Show all banners at the same time  
logo SolidsProcessing.nl
   
 
   

 
 
 
Airtechnic Solutions bv, Horst aan de Maas
 
Beek BV, Van, Drunen
 
VDL Industrial Products b.v., Eindhoven, Aalst- Erebodegem
 
Mettler-Toledo B.V., Tiel, `s-Hertogenbosch
 
TBK & DCP, Less spillage, more performance
 
Dinnissen B.V., Sevenum, Purmerend
 
 

Press release

New all-Draiswerke equipped colourant factory

Druckversion Send this news to.. Tweet this

KREATE goes for Draiswerke DCP Bead-mills

New all-Draiswerke equipped colourant factory KREATE goes for Draiswerke DCP Bead-mills 

KREATE is one of the fastest growing producers of pigment pastes for colour dispensers in Europe. For their newest production plant based in Belgium KREATE turned to Draiswerke for all of their production requirements.

The first phase of the factory saw deployment of a Drais vacuum-dissolver plus two vertical bead-mills. KREATE formulates and produces pigment pastes for popular in-shop paint dispensing systems and needs to stay ahead of the lastest technological developments. KREATE therefore wanted the DCP Megaflow 12 lab/pilot-plant mill for development work on new pastes. However, this high-performance mill is no slouch in the pilot plant role either!

Production volume is taken care of by the Draiswerke ACS-100 Megaflow mill with 8,5 litre high energy density milling chamber. This mill features a dynamic separation sieve which allows the use of very fine grinding media and an advanced rotor cooling system to keep product temps well below the critical treshold.

Draiswerke’s agent Agencies & Consultancy, in a co-operation effort with Brussels based contractors GUERCON have seen to all installation and fitting chores at this new factory. All equipment is integrated in a cooling loop that sports two roof-mounted cooling towers. These simple yet effective units are very affordable, virtually maintenance free and provide sufficient cooling capacity for a factory of this size. The new KREATE plant was declared fully operational in December 08.

More information:     Agencies & Consultancy De Moor b.v.b.a.    
Placed: 18/02/2009 Shown: news 418 x